Turn project scope into a schedule your team can use to coordinate work. Wiznic World develops Primavera P6 baseline schedules around project milestones, execution sequence, engineering and procurement interfaces, and the information available from your team.
A baseline is useful when the project team understands the work behind the dates. We work with the people responsible for delivery to clarify scope, sequence, calendars, responsibilities, and assumptions before treating a schedule as the reference plan.
The final scope, level of detail, file formats, and review arrangements are agreed in the proposal. Depending on that scope, the package can include:
Project scope or BOQ, contract milestones, activity information, execution methodology, calendars, interfaces, and any existing programme. Resource rates and quantities are needed where loading is included.
Review an example schedule and reporting layout to discuss the level of detail you need. The example uses fictional information and is not a client project record.
| Activity | Example work | Logic |
|---|---|---|
| A100 | Confirm installation drawings | Start of package |
| A110 | Prepare foundation | After A100 |
| A120 | Install equipment | After A110 and equipment availability |
Fictional example only. It is not a client deliverable, a quotation, or evidence of a project outcome.
Wiznic World completed the scheduling assignment for this flare-system package, including baseline scheduling, schedule updates, resource and cost loading, and reports.
For this effluent treatment plant (ETP) package, Wiznic World completed baseline scheduling, schedule updates, resource and cost loading, and reporting.
The initial phase of our engagement is complete, with the next schedule update planned. These examples describe Wiznic World's assignments; they do not indicate completion of the wider construction projects.
A BOQ is a useful input, but quantities alone do not define a workable execution sequence. We also discuss methodology, productivity assumptions, work fronts, interfaces, and milestone requirements.
We can prepare the schedule and support agreed review comments. Acceptance remains with the client or approving party; no approval outcome is guaranteed.
Yes. Schedule updating and reporting can be scoped as a follow-on engagement or included in the original work package.
Tell us the project type, location, target milestones, current planning stage, and when you need the baseline.
Request a Project Discussion WhatsApp the Consulting Team
We will review the information and agree the scope, deliverables, schedule, and commercial terms before starting.