A construction schedule should describe how the project will be delivered, not simply list dates from a tender. Primavera P6 helps calculate and communicate the plan once the team has defined the scope, sequence, calendars and resource assumptions. The video above introduces the planning concepts; the workflow below turns them into a repeatable process.

1. Establish the planning inputs

  • Scope of work, drawings, specifications and measurable quantities.
  • Contract milestones, handover boundaries and reporting requirements.
  • Engineering approvals, procurement lead times and construction interfaces.
  • Site access, working calendars, available crews and equipment.

Record missing information and assumptions. A provisional delivery date should be labelled and assigned an owner for confirmation, rather than treated as an agreed commitment.

2. Build a scope-based WBS

Organize the project by deliverable, area or work package so that activities can be checked against the scope. Separate engineering, procurement, construction and commissioning where their interfaces matter. Use activity codes for additional reporting views instead of duplicating the same work under several headings.

3. Estimate durations and connect the sequence

For a fictional package of 100 identical units, a crew output of 20 units per working day suggests five working days of production. This is an estimating assumption, not a promised duration: check access, setup, inspections, working hours and productivity evidence. Connect activities using the actual delivery method and explain significant lags or constraints.

4. Review the baseline before submission

Schedule the project, examine the driving path and test the milestones against engineering, procurement and site realities. Review open ends, calendars, excessive constraints and resource peaks. Document the schedule basis, exclusions and unresolved assumptions. A saved P6 baseline becomes an agreed reference only through the project’s approval process.

5. Update and communicate the forecast

Use a consistent data date, supported actual starts and finishes, and realistic remaining durations. Keep the approved baseline for comparison. Explain milestone movement, the work that now drives completion, and actions required from named owners. A look-ahead plan should identify the constraints preventing upcoming work from starting.

For help developing a project reference plan, see baseline scheduling. To learn the complete workflow, explore Primavera P6 training.

Reference: Oracle Primavera P6 Professional User Guide. Check the guide for your installed version; available features and settings differ between products and editions.

Apply this to your project

Need to develop your scheduling skills or review a live project requirement? Share your scope and the planning problem you want to solve.

Primavera P6 training · Scheduling services · Ask Wiznic World

Have a question or a correction? Contact the editorial team and include this article's title.

image