Primavera P6 Software and Scheduling FAQs

These FAQs explain Primavera P6 software and practical scheduling concepts. For Wiznic World course arrangements and learning options, visit our training FAQs.

What is Primavera P6 used for?

Primavera P6 supports project planning and scheduling, including activities, relationships, calendars, resources, costs, baselines and progress updates. The available functions depend on the product, version and configuration. Read our Primavera P6 introduction for an overview.

Are P6 Professional, P6 EPPM and Primavera Cloud the same?

No. P6 Professional is a desktop scheduling application. P6 EPPM supports enterprise project and portfolio management with web-based capabilities; P6 Professional can also connect to an EPPM database. Oracle Primavera Cloud is a separate cloud application, rather than simply P6 renamed.

What is the difference between a WBS and activities?

A work breakdown structure organises project scope into a hierarchy. Activities represent the scheduled work within that structure. A useful schedule connects the scope with activities, durations, calendars and logical relationships.

What is a baseline?

A baseline is a retained reference plan used to compare the current schedule with agreed expectations. Baseline selection and change control should follow the project's requirements; replacing a baseline merely to hide variance undermines the comparison.

What does the data date mean?

The data date is the schedule's progress cut-off or status date. Actual progress should be recorded consistently up to that date, with remaining work assessed for the forecast. It is not automatically the same as the date on which you open the software.

What information is needed for a schedule update?

Typically, the planner needs actual starts and finishes, remaining durations or work, progress measurements, and information about current constraints and changes. The project should define how progress is collected and checked. Changing percentage-complete values alone is not a complete update process.

What are critical path and float?

The critical path identifies work driving a completion point under the schedule's logic and settings. Float indicates scheduling flexibility calculated against relevant dates. Constraints, calendars and scheduling options can affect the results, so planners should review the logic rather than rely only on a colour or filter.

Can P6 help with resource and cost planning?

Yes. Resources and cost inputs can be assigned and analysed when the schedule is appropriately structured and loaded. Useful outputs depend on reliable quantities, rates, productivity assumptions and update rules; the software does not establish those inputs for you.

What computer and database requirements apply?

Requirements vary by release and deployment. Check the documentation for your exact product and version, including supported operating systems, database options and tested configurations. Use Oracle's P6 Professional documentation library rather than assuming a universal RAM, processor or database specification.

How should I compare P6 with Microsoft Project?

Compare the specific editions and your project's requirements: schedule complexity, shared data, reporting, integration, available skills and client submission standards. Avoid choosing solely on project size or assuming that one application is always better.

Does learning P6 mean learning only software commands?

No. Effective scheduling also requires scope interpretation, execution logic, resource assumptions, progress measurement and forecast explanation. Wiznic World connects software practice with project planning and controls, guided by Madan Maharana, with 27+ years of industry experience and Primavera teaching since 2007.

Where can I find training and exam information?

Explore Primavera P6 training, the LBMF training program and our exam and certification guide. A provider's course-completion certificate is different from an Oracle certification; verify current external exam requirements with Oracle.